Mirani Dam Project, Balochistan
Project Description

This 40 m high earth-filled dam was constructed across the Dasht River in Balochistan Province to create a reservoir having a gross storage capacity of 400 MCM. NESPAK carried out engineering studies, project preparation report, economic evaluation of the project and PC-I followed by detailed design of the dam, spillway, a 2 m dia tunnel, irrigation system, cost estimates, tender documentation, technical specification and management consultancy services. The Mirani Dam project was completed in 2007 at a cost of Rs. 7 billion.